                                                                    a result of constructions, while creating jobs
                                                                    to about 18,000 construction employees and
                                                                    58% of the project spend would be local.


                                                                    Medupi project has contributed to the
                                                                    improvement of local skills. Further, South
                                                                    African companies were prioritised for
                                                                    procurement and obtained 62% of the                  Project Management Consultancy
                                                                    R75 billion of the contracts.


                                                                    Other added benefits of the Medupi project
                                                                    included skills development as well as
                                                                    the investing in excess of R2.3 billion in
                                                                    infrastructure as well as socio-economic
                                                                    development initiatives in Lephalale.
 Case Study                                                         With the commissioning of the project, the


                                                                    availability of power and easing of load
                                                                    shedding in the region is expected to bring an
 World’s largest dry-cooled power station in South Africa           increase of about 0.35% to South Africa’s GDP.
 (capacity 6 x 800 MW)

                                                                    The project received a special recognition
               † † We simplified the engineering document           for helping with refurbishment and building
                  review process which saved time and               educational infrastructure in the Lephalale area.
                  drastically reduced the back logs. This           The project site was built on the principles of
                  simplified process helps to achieve the project   zero tolerance to harm.
                  milestone dates and reduce the project cost.
               † † As per our experience and advice, contractors    Sustainable initiatives
                  have categorised the NCR/NOD & data book          Developed as a zero-liquid effluent discharge
                  comments gave good results for achieving the      station that continuously monitors emissions,
                  milestones. This has also helped the closure of   all the cooling towers utilise direct cooling
                  NCRs and reduced backlogs.                        technology which uses air-cooling condensers.
               † † We have improved the quality as well as          Improved environmental performance via lower
                  reduced the data books review time, only          water usage, air bag filters, low NO  burners and
                                                                                                      2
                  because of our engineer’s minute observation      supercritical boilers was achieved.
                  skills and good technical knowledge.
                                                                    Value additions
               Value creation for the community                     Our best technical/quality practices helped

               The project will add 12% to the client’s             to improve the project time lines by avoiding
               power generation capacity, which can power           repeat works. Project provides direct
               Johannesburg and Pretoria at peak. The company       employment to almost 18,000 persons and
               is on a positive trajectory with its energy          also generates more indirect employment
               availability at 77.3% and operational surplus        and entrepreneurial opportunities in the region.
               capacity of 5,600 MW. TCE’s timely execution         TCE’s association in the project helped develop
               helped bring the project right on track to meet      local talent and knowledge transfer for similar
               deliverables. Eskom estimated the effect on town     projects in the future.
               of Lephalale’s GDP would be 95% per year as