Sectors
Infrastructure
Services
Design & Engineering
Location
West Bengal
Preparation of concept report and detailed engineering for a bridge to replace existing swing bridge at Kidderpore Dock, Calcutta. Bertlin and Partners, UK were the associate consultants to TCE. Concept report was started in September 1976 and submitted in December 1976. The estimated cost of civil works was Rs. 156 lakhs and that of electrical and mechanical works was Rs. 156 lakhs.
© Tata Consulting Engineers Limited. All Rights Reserved | Site Credits:DV